Excavation, embankment and earthwork states

Earthwork volumes between cross-sections are computed by the average-end-area method, V = [(A1 + A2)/2] × L. Soil changes volume as it is handled: excavated bank material swells when loosened for haul and shrinks when compacted into embankment, so a balance drawn in one state must be converted before it is compared in another. Exam questions name the state — bank, loose or compacted cubic yards — and the conversion direction is the whole question.

V = [(A1 + A2)/2] × L  ·  Loose volume = bank volume × (1 + swell)

Worked example Average-end-area volume with swell

Given: Two sections 100 ft apart have cut areas of 200 ft² and 300 ft². Find the bank volume, and the loose volume at 25% swell.

Solution:

  1. V = [(200 + 300)/2] × 100 = 250 × 100 = 25,000 ft³.
  2. Bank yards: 25,000/27 = 926 yd³.
  3. Loose: 926 × 1.25 = 1,157 yd³.

Answer: Bank volume ≈ 926 yd³; loose volume ≈ 1,157 yd³.

Layout, control and curve elements

Site layout sets the work from control points, and horizontal curves carry alignments around corners. For a circular curve, the degree of curve D ties to radius by R = 5,729.58/D (arc definition, feet), the tangent length is T = R tan(Δ/2), and the curve length is L = RΔ with Δ in radians — equivalently L = 100Δ/D in feet. The PC, PI and PT anchor every layout question: tangent in, curve, tangent out.

R = 5,729.58/D  ·  T = R tan(Δ/2)  ·  L = 100Δ/D

Worked example Curve elements

Given: A horizontal curve has degree of curve D = 10° and intersection angle Δ = 40°. Find R, L and T.

Solution:

  1. R = 5,729.58/10 = 573 ft.
  2. L = 100 × 40/10 = 400 ft.
  3. T = 573 × tan(20°) = 573 × 0.364 = 208.5 ft.

Answer: R ≈ 573 ft; L = 400 ft; T ≈ 209 ft.

Erosion control, retaining walls and safety

Erosion and sediment control keeps soil on the site: silt fence and check dams slow and pond runoff, stabilisation covers exposed soil, and controls are inspected and maintained — a silt fence is a sediment control, not an erosion control, a distinction the exam draws. Retaining walls are checked for sliding (friction resistance against the earth-pressure resultant) and overturning, each with its factor of safety. Safety duties centre on excavation protection: sloping, benching, shoring or shielding, with the flattest slopes for the weakest (Type C) soils.

FSsliding = μW / Pa  ·  Pa = ½ Ka γ H²

Worked example Sliding check for a retaining wall

Given: A wall weighing 10,000 lb per foot of length sits on soil with friction coefficient μ = 0.50. The retained soil (γ = 120 lb/ft³, Ka = 0.333) stands 10 ft high. Find the sliding factor of safety.

Solution:

  1. Resultant thrust: Pa = ½ × 0.333 × 120 × 10² = 2,000 lb/ft.
  2. Friction resistance: 0.50 × 10,000 = 5,000 lb/ft.
  3. FS = 5,000/2,000 = 2.5.

Answer: Sliding FS = 2.5.

3-question mini-quiz

Project Sitework

Choose your answer, then check it to see the result and explanation.

1. Sections 50 ft apart have areas 100 ft² and 160 ft². The volume between them is:

2. For a curve with D = 5°, the radius is closest to:

3. A sediment control, as distinct from an erosion control, is:

Ready for the complete rehearsal?

Step up from this three-question taster to the full timed PE WRE simulation — 80 questions in exam conditions, with a per-area diagnostic.

Keep building exam speed

This whole hub is free — every area page, mini-quiz and podcast. When you are ready to rehearse under exam conditions, the separate PE WRE exam simulation runs the full 80 questions against the clock.

Preview the PE WRE exam simulation Open the exam simulator